ARC Management Systems
  • Home
  • About Us
    • Our Clients
    • Careers
    • Links
  • Contact Us
ARC Management Systems on Linked In ARC Management Systems on facebook
  • Quality Services
    • ISO 9001
    • Implementating ISO Systems
    • Maintainence of ISO Systems
    • Quality Audits
    • Integrating ISO Systems
    • TS 16949
  • Environmental Services
    • Waste Permits & Licences Applications
    • IPPC Licences
    • AER Reports
    • Environmental Impact Assessments
    • ISO 14001
    • ISO 16001
  • Health & Safety Services
    • Safety Statements
    • Risk Assessments
    • Human Resources
    • OHSAS 18001
  • CE Marking
    • Our Services
    • The CE Marking Process
    • Useful Videos
    • CE Marking FAQ's
  • Lean Services
    • Value Stream Mapping
    • 5S & Visual Improvements
    • Standard Work
    • Kaizen Events
    • Set-up Reduction
    • T.P.M
  •  
  • Page IconIntroduction
  • Page IconThree Elements
  • Page IconTakt Time
  • Page IconWork Sequence
  • Page IconW.I.P.
  • Page IconThe Steps
  • Page IconExample 1
  • Page IconExample 2
  • Page IconExample 3
  • Page IconExample 4
  • Page IconExample 5
  • Page IconExample 6
  • Page IconExample 7
  • Page IconExample 8
  • Page IconExample 9
  • Page IconGetting Started
Specialists in Standard Work

Standard Work

An EFFECTIVE and ORDERLY method for producing with minimum WASTE.

ARC Management Systems
Unit 4, IDA Industrial Estate,
Purcellsinch,
Kilkenny,
Ireland.
www.arcmanagementsystems.com
Contact Us

This document has been formulated  in order to explain to organizations about Kaizen Events, the requirements of the 5S & Visual Workplace in simple terms and some of the benefits of the if they are applied correctly.

We hope you find this document useful and please do not hesitate to contact us with any questions.

Specialists in Standard Work

Three Elements

TAKT Time

TAKT Time = Time Available ÷ Customer Demand

Work Sequence

The order of operations in which a worker carries objects, mounts them on machines, and removes them, etc. This should be distinguished by the “Processing Sequence” according to which a product is made.

Standard Work-In-Process< (W.I.P.)

Refers to the minimum W.I.P. needed to perform repetitive operations (parts mounted on machines, parts on conveyors, parts needing time to cure, etc.)

Specialists in Standard Work

Takt Time

TAKT Time = Time Available ÷ Daily Customer Demand &multiply;

Time Available per Day:
One 8-Hr Shift = 480 min
2 Shifts per Day = 480 x 2 = 960 min
In Seconds = 960 x 60 = 57,600 sec

Sales per Day:
457 units.

TAKT Time: 57,600 sec/day ÷ 457 units/day = 126 sec/unit

Working to Takt Time is Fundamental to Lean Mfg

Specialists in Standard Work

Work Sequence

  1. Presents a physical layout of the machinery in the work area.
  2. Indicates the order of operations and flow.
  3. Defines the Standard W.I.P. allowable at each workstation.
Specialists in Standard Work

W.I.P.

Work-In-Process is the minimum number of unfinished work pieces needed to complete the process.

We may need to increase W.I.P. – For Example
Parts need to cool down
Machine cycles automatically

A Kanban is a Visual Information System established to maintain the DISCIPLINE of a JIT System on the shop floor.

Specialists in Standard Work

The Steps

  1. Familiarise yourself with process and surroundings
  2. Draw the process area layout
  3. Break down each part of the process into simple steps
  4. Write down the work elements
  5. Show the work sequence
  6. Measure individual work elements (at least 10 times)
  7. Measure cycle-time (at least 10 times)
  8. Complete the following forms/sheets
    1. Time Observation Form
    2. Standard Work Combination Sheet
    3. Standard Work Sheet (Workstation Layout)
    4. Takt Time V’s Actual Bar Chart (Entire process)
Specialists in Standard Work

Time Observation Form – A Worked Example

Time Observation Form – A Worked Example
Specialists in Standard Work

Standard Work Combination Sheet – A worked Example

Standard Work Combination Sheet – A worked Example
Specialists in Standard Work

Standard Work Combination Sheet

Standard Work Combination Sheet
Specialists in Standard Work

Standard Work Layout – A Worked Example

Standard Work Layout – A Worked Example
Specialists in Standard Work

Cycle Time Bar Chart

Cycle Time Bar Chart
Specialists in Standard Work

Cycle Time Bar Chart

Cycle Time Bar Chart
Specialists in Standard Work

Cycle Time Bar Chart

Cycle Time Bar Chart
Specialists in Standard Work

Cycle Time Bar Chart

Cycle Time Bar Chart
Specialists in Standard Work

Cycle Time Bar Chart

Cycle Time Bar Chart
Specialists in Standard Work

If you have decided to get started:



Give us a call
We will assess what you will need (FREE)
We will audit your process (FREE)
Provide options (FREE)
Recommend the best method (FREE)