An EFFECTIVE and ORDERLY method for producing with minimum WASTE.
This document has been formulated in order to explain to organizations about Kaizen Events, the requirements of the 5S & Visual Workplace in simple terms and some of the benefits of the if they are applied correctly.
We hope you find this document useful and please do not hesitate to contact us with any questions.
Specialists in Standard Work
Three Elements
TAKT Time
TAKT Time = Time Available ÷ Customer Demand
Work Sequence
The order of operations in which a worker carries objects, mounts them on machines, and removes them, etc. This should be distinguished by the “Processing Sequence” according to which a product is made.
Standard Work-In-Process< (W.I.P.)
Refers to the minimum W.I.P. needed to perform repetitive
operations (parts mounted on machines, parts on conveyors,
parts needing time to cure, etc.)
Specialists in Standard Work
Takt Time
TAKT Time = Time Available ÷ Daily Customer Demand &multiply;
Time Available per Day:
One 8-Hr Shift = 480 min
2 Shifts per Day = 480 x 2 = 960 min
In Seconds = 960 x 60 = 57,600 sec
Sales per Day:
457 units.
TAKT Time: 57,600 sec/day ÷ 457 units/day = 126 sec/unit
Working to Takt Time is Fundamental to Lean Mfg
Specialists in Standard Work
Work Sequence
- Presents a physical layout of the machinery
in the work area.
- Indicates the order of operations and flow.
- Defines the Standard W.I.P. allowable
at each workstation.
Specialists in Standard Work
W.I.P.
Work-In-Process is the minimum number of unfinished work pieces needed to complete the process.
We may need to increase W.I.P. – For Example
Parts need to cool down
Machine cycles automatically
A Kanban is a Visual Information System established to maintain the DISCIPLINE of a JIT System on the shop floor.
Specialists in Standard Work
The Steps
- Familiarise yourself with process and surroundings
- Draw the process area layout
- Break down each part of the process into simple steps
- Write down the work elements
- Show the work sequence
- Measure individual work elements (at least 10 times)
- Measure cycle-time (at least 10 times)
- Complete the following forms/sheets
- Time Observation Form
- Standard Work Combination Sheet
- Standard Work Sheet (Workstation Layout)
- Takt Time V’s Actual Bar Chart (Entire process)
Specialists in Standard Work
Time Observation Form – A Worked Example
Specialists in Standard Work
Standard Work Combination Sheet – A worked Example
Specialists in Standard Work
Standard Work Combination Sheet
Specialists in Standard Work
Standard Work Layout – A Worked Example
Specialists in Standard Work
Cycle Time Bar Chart
Specialists in Standard Work
Cycle Time Bar Chart
Specialists in Standard Work
Cycle Time Bar Chart
Specialists in Standard Work
Cycle Time Bar Chart
Specialists in Standard Work
Cycle Time Bar Chart
Specialists in Standard Work
If you have decided to get started:
Give us a call
We will assess what you will need (FREE)
We will audit your process (FREE)
Provide options (FREE)
Recommend the best method (FREE)